3238429 - 5530B10 battery - r+r

Removing ( Refitting )  - 1048A34  sleeve(s) from flow meter to air supply capacity case - r + rDisconnect the earth lead.1. Remove the battery terminal cap, disconnect positive lead (1a), undo retaining nut (1b) and remove the battery.
Refitting ( Removing ) Position the battery in the compartment, secure with the nut, connect the positive lead and refit the battery terminal cap.Connect the earth lead. - 1048A34  sleeve(s) from flow meter to air supply capacity case - r + r Removing ( Refitting ) Disconnect the battery negative terminal.1. Open the supply box protective cover.2. Release the clip and undo the box retaining bolts.3. Loosen the battery positive terminal nut.

NameConnector
3Battery  A1 
4. Raise the supply box.
1. Undo the nut and release the battery retaining strap.2. Remove the battery.
Refitting ( Removing ) Check that the battery is intact and shows no signs of damage. Also check that the terminals are not contaminated or oxidised.Position the battery in its seat.Fit the retaining strap and tighten the nut.Position the supply box in its seat.Tighten the battery positive terminal nut.Tighten the retaining bolts and do up the clip.Close the protective cover and connect the battery negative terminal.Test the electrical system.