3315604 - E3030 HEATED REAR WINDSCREEN AND DOOR MIRROR DEFROSTING - Functional description
Functional description
The heated rear window relay
J55
controls the simultaneous switching on of the demisting function
of the rear window
P55
, the heated windscreen
P56
and the external rearview mirrors
P60
and
P61
.(The
control circuit of the heated rear window
P55
passes through
the power source/amplifier aerial
P25
- see E3510 - RADIO)
The supply line for the demisters
P56
,
P60
,
P61
is also protected by the mirror demister fuse
B16
.
The relay
J55
is supplied by the
direct line from the battery through the fuse
B33
.
An earth signal, suitably timed, coming
from the check device
M45
(pin 10 of connector C) energizes
the coil of relay
J55
so a supply is sent to the resistances
P55
,
P56
,
P60
and
P61
.
An ignition-operated power supply (INT/A)
for the Check device
M45
reaches pin 9 of connector C through
fuse
F1
of junction unit
B1
; pin 7 of connector
C is earthed.
The check device
M45
receives an
engagement command at pin 11 of connector A from pin 9 of connector
B of the supply control unit
M70
.
The control unit
M70
, in turn, receives
a command from the switch in the climate control system control
panel
H80
, at pin 13 of connector C via the serial line.
The check device
M45
operates the
heated rear windscreen relay
J55
when, in addition to the
engagement signal, the engine rpm signal coming from the instrument
panel
E50
(pin 20 connector B) reaches pin 8 connector B.
The enablement takes place when the engine
speed is above 1000 rpm.
The climate control system control unit
M70
is supplied at pin 11 connector B from the battery via the fuse
CENTR
B5
, the contact for relay
R1
of control unit
B1
and from fuse
F9
.
The coil for relay
R1
is energized
via the INT/A line from the ignition switch
H1
.
Pin 8, connector C of the control unit
M70
,
is connected to earth
C21
.
The control unit
M70
is supplied
- to pin 11 of connector B - from the ignition-controlled line (INT/A)
of relay
R1
protected by fuse
F9
of junction unit
B1
;
pin 8 of connector C is earthed. From pin 9 of connector B of
M70
,
the command is sent to the Check device
M45
- pin 11 of
connector A.
With the function switches on, the Check
device
M45
sends a signal, from pin 2 of connector B, to
light up the LED which signals the engagement of the function: the
signal reaches pin 11 of connector C of
M70
and from there
the controls
H80
.