2891814 - 5040B14 air conditioner system multi-level pressure switch - r+r
 Removing
		(
		Refitting
Removing
		(
		Refitting )
	1. Open the bonnet lid and disconnect the electrical connection.
		)
	1. Open the bonnet lid and disconnect the electrical connection.|  | Name | Connector | 
|---|---|---|
| 1 | 3 stage pressure switch | K5 | 

 Refitting
		(
		Removing
Refitting
		(
		Removing )
	Check that the pressure switch
is not damaged and, if necessary, test it.Tighten the multi-stage pressure switch
in its housing.
		)
	Check that the pressure switch
is not damaged and, if necessary, test it.Tighten the multi-stage pressure switch
in its housing.|  | Fastening | Component | Ø | Value(daNm) | 
|---|---|---|---|---|
| - | - | AIR CONDITION SYST MULTI LEVEL PRES SWTC | - | 0.8 |