3024851 - 1072B50 sleeves connecting air capacity box to inlet manifold is - r+r
 Removing
		(
		Refitting
Removing
		(
		Refitting )
	Make sure that the ignition key is in the
OFF position. then disconnect the battery negative (-) terminal.
		)
	Make sure that the ignition key is in the
OFF position. then disconnect the battery negative (-) terminal.|  | Name | Connector | 
|---|---|---|
| - | Battery | A1B | 

|  | Name | Connector | 
|---|---|---|
| 1 | Throttle body actuator | N75 | 

|  | Name | Connector | 
|---|---|---|
| 3a | Lambda sensor downstream of post-catalyzer | K17 | 
|  | Name | Connector | 
|---|---|---|
| 3b | Lambda sensor on catalyzer -2 | K18 | 
|  | Name | Connector | 
|---|---|---|
| 4 | Detonation sensor - 1 | K50 | 


|  | Name | Connector | 
|---|---|---|
| 1a | Engine management ECU | M10A | 
|  | Name | Connector | 
|---|---|---|
| 1b | Engine management ECU | M10B | 




 Refitting
		(
		Removing
Refitting
		(
		Removing )
	Place the air chamber complete with injection/ignition system
control unit and throttle casing integrated with D.V.L. back in
its housing and secure it using the bolts.Refit in its seating the reinforcement
between the air chamber and bracket on the engine for the reaction link
and secure it with its bolts.Tighten the bands fixing the inlet ducts
to the air chamber.Place the coolant rigid return pipe to
the engine cooling system reservoir back in its housing and fix
it using the bolts.Connect the flexible pipes to the engine
coolant reservoir rigid coolant return pipe and tighten the bands.Connect the earth lead to the air chamber
and secure it using the bolts.Connect the electrical connections to the
fuel injection/ignition control unit.Place the electrical connections box back
in its housing and secure it using the bolts.Fasten the electrical wiring for the timing
side detonation sensor and the fuel supply pipe to the cable duct.Connect the electrical connection for the
detonation sensor, timing side.Connect the electrical connections for
the rear Lambda sensors to the catalytic converter.Connect the engine junction.Close the electrical connections box cover.Connect the brake servo vacuum intake pipe
to the air chamber and tighten the band.Connect the rapid connector for the fuel
vapour recirculation pipe to the air chamber.Connect the oil vapour recovery pipe to
the air chamber and tighten the band.Connect the electrical connection to the
throttle body integrated with the D.V.L.Place the corrugated hose, complete with
resonator, back in its housing and tighten the bands.Connect the oil vapour recirculation pipe
to the corrugated hose and tighten the band.Connect the negative (-) battery terminal.
		)
	Place the air chamber complete with injection/ignition system
control unit and throttle casing integrated with D.V.L. back in
its housing and secure it using the bolts.Refit in its seating the reinforcement
between the air chamber and bracket on the engine for the reaction link
and secure it with its bolts.Tighten the bands fixing the inlet ducts
to the air chamber.Place the coolant rigid return pipe to
the engine cooling system reservoir back in its housing and fix
it using the bolts.Connect the flexible pipes to the engine
coolant reservoir rigid coolant return pipe and tighten the bands.Connect the earth lead to the air chamber
and secure it using the bolts.Connect the electrical connections to the
fuel injection/ignition control unit.Place the electrical connections box back
in its housing and secure it using the bolts.Fasten the electrical wiring for the timing
side detonation sensor and the fuel supply pipe to the cable duct.Connect the electrical connection for the
detonation sensor, timing side.Connect the electrical connections for
the rear Lambda sensors to the catalytic converter.Connect the engine junction.Close the electrical connections box cover.Connect the brake servo vacuum intake pipe
to the air chamber and tighten the band.Connect the rapid connector for the fuel
vapour recirculation pipe to the air chamber.Connect the oil vapour recovery pipe to
the air chamber and tighten the band.Connect the electrical connection to the
throttle body integrated with the D.V.L.Place the corrugated hose, complete with
resonator, back in its housing and tighten the bands.Connect the oil vapour recirculation pipe
to the corrugated hose and tighten the band.Connect the negative (-) battery terminal.