194002193 - 1080C83 EXHAUST GAS INLET PIPING FROM EXHAUST MANIFOLD TO HEAT EXCHANGER EGR - R R
 Removing
		(
		Refitting
Removing
		(
		Refitting )
	- Position the vehicle on a lift.    Op. 5530B10 BATTERY - R+R    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R    Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.1. Undo the radiator coolant drain plug.
		)
	- Position the vehicle on a lift.    Op. 5530B10 BATTERY - R+R    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R    Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.1. Undo the radiator coolant drain plug.|  | Collect the coolant in a suitable container. | 



 Refitting
		(
		Removing
Refitting
		(
		Removing )
	1. Place the exhaust gas intake pipe from the exhaust manifold to the E.G.R. heat exchanger (1a) back in its housing complete with gaskets (1b), then secure it tightening the collar (1c) and the bolts (1d) to the recommended torque.
		)
	1. Place the exhaust gas intake pipe from the exhaust manifold to the E.G.R. heat exchanger (1a) back in its housing complete with gaskets (1b), then secure it tightening the collar (1c) and the bolts (1d) to the recommended torque.| Component | Fastening | dia | Value (daNm) | Validity | 
|---|---|---|---|---|
| Exhaust gas/water heat exchanger for E.G.R. system | Bolt | M8 | (exhaust manifold side) 2.3 - 2.8 | 1.9 JTD 16v2.4 JTD 20v | 
