198002112 - 1088D47 COOLANT SUPPLY AND RETURN HOSES TO ENGINE OIL HEAT EXCHANGER - R.R.
Removing ( Refitting ) - Position the vehicle on a lift. Op. 1016A10 SOUND-PROOFING COVER - R.R Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R. Op. 0010T20 ENGINE COOLANT - CHANGE 1. Loosen the bands and disconnect the supply and return pipes from the heat exchanger.
1. Loosen the band and disconnect the supply pipe from the rigid pipe and remove it.2. Loosen the band and disconnect the supply pipe from the rigid pipe return pipe to the water pump and remove it.
Refitting
(
Removing
)
- Place the supply and return pipes in position and connect them to the heat exchanger and to the rigid pipes using the bands. Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R. Op. 1016A10 SOUND-PROOFING COVER - R.R Op. 0010T20 ENGINE COOLANT - CHANGE - Remove the vehicle from the lift.