- If necessary, loosen the band and disconnect the pipes removed previously.Refitting
(
Removing
)
- Connect the supply pipes and tighten the band.- Place the rigid supply pipe in position and connect it to the EGR heat exchanger using the band.- Connect the rigid supply pipe to the flexible pipe, engine oil heat exchanger side using the band.- Tighten the bolts fixing the rigid supply pipe to the water pump return pipe. Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R. Op. 1016A10 SOUND-PROOFING COVER - R.R Op. 0010T20 ENGINE COOLANT - CHANGE - Remove the vehicle from the lift.