199000066 - 5040A50 PIPE FROM AIR CONDITIONING COMPRESSOR TO CONDENSER - R+R
 Removing
		(
		Refitting
Removing
		(
		Refitting )
		)
	|  | Follow the safety instructions. Op. 5040 AIR CONDITIONING CASING AND COMPONENTS | 
|  | Seal the connectors that have been disconnected using suitable plugs to prevent dampness and impurities from entering the system. | 


 Refitting
		(
		Removing
Refitting
		(
		Removing )
	- Check that the pipe from the compressor to the condenser is not damaged and that there are no cracks that could compromise the seal.
		)
	- Check that the pipe from the compressor to the condenser is not damaged and that there are no cracks that could compromise the seal.|  | Replace the O rings for the connectors. Only use green coloured seals that are resistant to R134a coolant.Lubricate the connector threads using anti-freeze. | 
| Component | Fastening | dia | Value (daNm) | Validity | 
|---|---|---|---|---|
| Pipe connector on compressor | Bolt | M6 | 0.5 ÷ 0.7 | 1.2 8v1.4 8v1.4 16v1.4 16v TJet1.9 Multijet | 
