199005145 - 1048B45 RIGID AIR SUPPLY PIPE BETWEEN HEAT EXCHANGER AND INTERMEDIATE HOSE - R.R.
Removing ( Refitting ) - Position the vehicle on a lift. Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R. Op. 7210E10 R.R. FRONT BUMPER 1. Loosen the band (1a) and disconnect the hose (1b) from the rigid air supply pipe to the throttle body.
1. Loosen the band (1a), undo the bolt (1b) and remove the air hoses (1c).
1. Loosen the band (1a) and disconnect the rigid pipe (1b) from the hose (1c).
Refitting
(
Removing
)
- Connect the rigid pipe to the hose and tighten the band.- Place the air hoses in position, connect them using the bands and tighten the fixing bolt at the front end. Op. 7210E10 R.R. FRONT BUMPER Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R. - Remove the vehicle from the lift.