4CarData
eLearn
Контакты
English
T.T.
LANCIA
THESIS
2.4 20V
FAULT DIAGNOSIS
10 ENGINE
1056 PETROL FUEL INJECTION SYSTEM
1056B MULTI-POINT INJECTION SYSTEM (MPI)
1056B87 INJECTION/IGNITION CONTROL UNIT MOUNTING - R.R.
93718 - 1056B87 INJECTION/IGNITION CONTROL UNIT MOUNTING - R.R.
Removing
(
Refitting
)
- Make sure that the ignition key is in the OFF position, then disconnect the negative battery terminal.
See in Op. 1016A40 Ignition COIL COVER on cylinder head - R.R.
See in Op. 1048A28 vacuum air circuit resonator pipe - r+r
See in Op. 1048A48 HOSE BETWEEN RESONATOR AND THROTTLE CASING - R.R.
See in Op. 1056B82 Injection/ignition system CONTROL UNIT (one) - R.R.
See in Op. 1056B14 THROTTLE CASING - R.R.
- Release the dashboard/engine cable coupling from the mounting bracket.
1. Undo the bolt fixing the injection/ignition control unit mounting to the modular intake manifold.
2. Undo the bolt (2a) and disconnect the earth lead (2b) from the injection/ignition control unit mounting.
3. Remove the injection/ignition control unit mounting.
Refitting
(
Removing
)
- Position the injection/ignition control unit mounting, connect the earth lead to it, then secure the mounting to the modular intake manifold using the bolt.
See in Op. 1056B14 THROTTLE CASING - R.R.
See in Op. 1056B82 Injection/ignition system CONTROL UNIT (one) - R.R.
See in Op. 1048A48 HOSE BETWEEN RESONATOR AND THROTTLE CASING - R.R.
See in Op. 1048A28 vacuum air circuit resonator pipe - r+r
- Secure the dashboard/engine cable coupling to the mounting bracket.
See in Op. 1016A40 Ignition COIL COVER on cylinder head - R.R.
- Connect the negative battery terminal.