194002168 - 1048B25 INTERMEDIATE RIGID PIPE BETWEEN HEAT EXCHANGER AND THROTTLE BODY - R R

Removing ( Refitting ) - Position the vehicle on a lift.    Op. 5530B10 BATTERY - R+R    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R    Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.    Op. 1048B20 AIR SUPPLY HOSE FROM HEAT EXCHANGER TO RIGID PIPE - REPLACE1. Undo the lower bolt fixing the intermediate throttle body rigid air supply pipe to the hoses.
1. Undo the upper bolt fixing the intermediate throttle body rigid air supply pipe to the hoses.2. Loosen the band (2a) and remove the intermediate throttle body rigid air supply pipe to the hoses (2b).
Refitting ( Removing ) - Place the intermediate throttle body rigid air supply pipe to the hoses in position and secure it using the band.- Tighten the upper bolt fixing the intermediate throttle body rigid air supply pipe to the hoses.- Tighten the lower bolt fixing the intermediate throttle body rigid air supply pipe to the hoses.    Op. 1048B20 AIR SUPPLY HOSE FROM HEAT EXCHANGER TO RIGID PIPE - REPLACE    Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.    Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R    Op. 5530B10 BATTERY - R+R- Remove the vehicle from the lift.